Facade view Mizal with Duraflon

Future draft

Duraflon metal mica shade VAG E01 on the closed cavity facade of MizalA running track and an open-air gym on a park-like roof garden landscape. Robots that park cars in the underground garage in a fully automated manner. Curved building shapes and highly flexible floor plans. What sounds like dreams of the future will soon be reality.

The Mizal – Visions on Campus project is currently under construction at Düsseldorf’s Medienhafen and is a great example of the working environments of tomorrow.

 

Reason enough for us to take a look at the construction site. After all, the coating of the closed cavity façade in a delicate Duraflon® metallic mica shade came from us. The trip to the construction site was well worth it.
These are great perspectives!

You can find out more about the Mizal – Visions on Campus project here or on the website of Eller + Eller Architekten.